Quick Navigation Cheat Sheet
Overview
This cheat sheet provides quick reference for navigating the Dr Migrate platform efficiently. Use this guide to quickly locate tools, features, and understand the platform workflow without needing to explore each section in detail.
Platform Login Methods
Dr Migrate offers two primary access methods depending on your deployment type:
Top-Level Navigation (The Six Chevrons)
The platform navigation reflects the complete migration planning workflow. Each chevron represents a critical phase in your migration journey:
Platform Layout & Top-Level Navigation
Dr Migrate is built around a top-level navigation bar that reflects the migration planning workflow. Each chevron represents a critical phase in your migration journey, with dropdown menus providing access to specific tools and features.
Activity Tracker Progress States
When you log in, you’ll land on the Dashboard with the Activity Tracker providing visual project progress:
Locked 🔒: Prerequisites not yet complete - these tasks cannot be started until dependency requirements are met
To-Do ⭕: Ready for action - all prerequisites satisfied and task can be initiated
Completed ✅: Signed-off and done - task finished and validated
AI-Powered Assistants Quick Reference
Dr Migrate includes AI-powered Assistants that speed up repetitive or complex tasks. All processing is performed locally, ensuring data security.
Navigation Glossary – Where to Find Things
Use this reference section to locate tools and actions across the platform, organized by common task categories:
Costing & TCO
Task | Location |
---|---|
Change Azure pricing assumptions | Setup → TCO → Azure Settings |
Update on-prem cost estimates | Setup → TCO → On-Prem Benchmark |
View current vs future cost models | Insights → Cost Analysis Dashboard |
Export TCO comparisons | Insights → Downloads tab |
Inventory & Applications
Task | Location |
---|---|
Auto-map servers to applications | Inventory → CMDB Assistant |
Bulk upload app mappings | Inventory → Applications (Import) |
Manually edit mappings | Inventory → Applications |
Review application status | Insights → Advanced Dashboard |
Workflow Progress
Task | Location |
---|---|
Check completion status | Dashboard → Activity Tracker |
Sign off a workflow step | Each chevron → top-right Sign-Off |
View audit log (if enabled) | Setup → Admin |
Dashboards & Reports
Task | Location |
---|---|
Access dashboards | Insights |
Download reports | Insights → Rapid Insights |
View stakeholder summaries | Insights → Executive Report tab |
Platform Administration
Task | Location |
---|---|
Manage users | Setup → Admin |
Change org-wide defaults | Setup → Settings |
Sign-Offs & Task Completion
Each chevron includes a Sign-Off control (typically found in the top-right corner of most pages). This feature enables you to mark stages as complete and progress through the workflow systematically.
Sign-Off Process
- Mark Stage Complete: Use the sign-off control to indicate that a workflow stage has been finished to your satisfaction.
- Unlock Downstream Tasks: Signing off automatically unlocks the next dependent tasks in the Activity Tracker.
- Reflect in Reports: Completion status is reflected in reports and dashboards, providing stakeholder visibility.
Quick Tips for Efficient Navigation
Keyboard Shortcuts
- Use Ctrl+F (or Cmd+F on Mac) to search within any page
- Use browser bookmarks for frequently accessed sections
- Use browser tabs to keep multiple sections open simultaneously
Best Practices
- Start with Dashboard: Always check the Activity Tracker first to understand your current progress
- Use the Glossary: Reference the navigation tables above when you need to find specific features
- Leverage AI Assistants: Don’t hesitate to use the AI assistants to speed up repetitive tasks
- Sign Off Regularly: Mark stages complete as you finish them to unlock downstream tasks
- Export Reports: Use the Insights section to generate and download reports for stakeholders
Common Workflows
For New Projects:
- Setup → Configure TCO assumptions
- Inventory → Map applications to servers
- Goals → Define migration strategy
- Planning → Assign treatments and build waves
- Migrate → Execute migration plan
For Ongoing Projects:
- Dashboard → Check Activity Tracker status
- Insights → Generate progress reports
- Planning → Adjust strategies as needed
- Migrate → Monitor execution progress